Project Overview
GHK Piling (a division of Steve Bowling Contracting) was subcontracted by Ventia to carry out construction of the new Pokapu bridge. The bridge construction required concrete piles embedded into basalt rock and construction of a new 60m long three span bridge over a river prone to flooding. The integral design required all elements to be locked together, creating challenging construction phases both on, and off of site. With bored concrete piles embedded into the basalt, and 15 precast beams weighing over 20 tons each, the new bridge is an achievement we are proud to put our name to.